22dcc5b6ec720fcbfc828bd77a1c245a9facd863
- Lambert's problem solver using universal variable method with bisection (handles elliptic, parabolic, hyperbolic transfers + anti-podal cases) - Transfer matrix: precompute pairwise station transfers over time window using Lambert solver with configurable launch velocity - Dijkstra routing on time-expanded graph (station × week nodes, transfer + wait edges) to find minimum-time routes - Route Planner UI: from/to station dropdowns, search window selector (1-10 years), "Find Optimal Route" button with results card - Route visualization: orange dashed trajectory lines with arrow heads and leg numbers on the 2D canvas - Tested: Mercury L1 → Jupiter L1 computes 6-month direct transfer at 30 km/s — physically reasonable Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
Description
No description provided
Languages
Rust
58.5%
Svelte
23.7%
TypeScript
16.9%
CSS
0.3%
HTML
0.3%
Other
0.3%